58 lines
2.8 KiB
ReStructuredText
58 lines
2.8 KiB
ReStructuredText
.. highlight:: none
|
||
|
||
-----------------
|
||
Auxiliary Charger
|
||
-----------------
|
||
|
||
The **Elips 2000W** (as the name says) does only charge with ~2 kW, thus needing 3-3.5 hours to
|
||
charge the original Twizy battery. That‘s quite slow and gets worse when `replacing the battery by
|
||
a larger one <https://github.com/dexterbg/Twizy-Virtual-BMS>`_.
|
||
|
||
The Elips is running a special Renault firmware and also taking a crucial role in the Twizy system
|
||
communication, for example to control the BMS. So it cannot easily be replaced by a third
|
||
party charger.
|
||
|
||
But a **third party charger can run in parallel** to the Elips to boost the charge power. This can
|
||
be done best from the "rear end", i.e. using the battery main connector as the power input (like
|
||
the SEVCON does during regenerative braking).
|
||
|
||
**Some documented examples of additional chargers:**
|
||
|
||
- https://www.twizy-forum.de/werkstatt-twizy/84935-twizy-schnelllader
|
||
- https://www.twizy-forum.de/projekte-twizy/83603-schnell-lader-extern
|
||
- https://www.twizy-forum.de/tipps-und-tricks-twizy/80814-twizy-schnellladen-die-wave-kann-kommen
|
||
|
||
**The caveat:** to avoid damaging the battery, additional charge power should not be supplied when
|
||
the battery is nearly full. So the additional charger needs to be switched off before the main
|
||
charger finishes.
|
||
|
||
The OVMS can **automate** switching the additional charger both on and off. Any of the available
|
||
EGPIO output ports (see :doc:`/userguide/egpio`) can be used for this task. If the charger has
|
||
no digital power control input, a convenient way is to use the switched 12V supply available at the
|
||
DA26 expansion plug without additional hardware. The 12V port can deliver a nominal output of 25W or
|
||
1.8A, and up to 40W or 2.9A short term, so can be used to power a standard automotive relay
|
||
directly.
|
||
|
||
**Configuration:**
|
||
|
||
Simply set the EGPIO to be used in config parameter ``xrt aux_charger_port``. For example, to use
|
||
the switched 12V port = EGPIO port 1, do::
|
||
|
||
OVMS# config set xrt aux_charger_port 1
|
||
|
||
Set the port to 0 to disable the feature.
|
||
|
||
**Mode of operation:**
|
||
|
||
- The port is **switched ON** when the Twizy charges, is below 94% SOC, is still within the CC
|
||
phase (i.e. not topping off / balancing), and the charge current is not under user control.
|
||
|
||
- The port is **switched OFF** when the Twizy stops charging, reaches 94% SOC or enters the
|
||
topping off phase (whichever comes first), or when you set a custom charge current.
|
||
|
||
**Charge current control:**
|
||
|
||
If you set the **charge current** to level 7 (35 A), only the original charger will run, but at
|
||
full power. You can set levels 6…1 (30…5 A) to reduce the charge power, only using the Elips
|
||
charger. Setting the current to level 0 (no charge throttling) will allow maximum charge current
|
||
from the Elips charger and additionally enable the second charger.
|