The workaround for PSRAM that will occupy an SPI bus is enabled only when:
1. used on 32MBit ver 0 PSRAM.
2. work at 80MHz.
The test used to only check 32MBit by the config option, but for PSRAM
on Wrover-B module seems to use a newer version of 32MBit PSRAM. So it
expects the workaround to be enabled, but actually not.
This commit split the unit test into two parts:
1. check all SPI buses are available, for all configs except psram_hspi
and psram_vspi, run on regular runners (including Wrover and Wrover-B).
a hidden option is enabled so that the compiler knows it's not building
psram_hspi or psram_vspi.
2. check the specified bus are acquired, for config psram_hspi and
psram_vspi. This only run on special runner (legacy Wrover module).
1. Add the 100 times test when the private key is generated by the random number;
2. Add the bt components to the unit-test-app/config directory.
3. Added the bt unit test case to CI.
For some test configurations, not all tests need to be run. This
change allows adding a comment in the configuration file of the
following form:
unit-test-app makefile will use it to determine which components to
build. If the comment is not present, all components will be built
(TESTS_ALL=1).
Also add test configuration for libsodium. It is a separate test
configuration due to the large binary size generated when building
libsodium tests.