Jonathan Naylor
b1544c26a2
More P25 network data changes.
2017-10-31 10:18:15 +00:00
Jonathan Naylor
aeca35a77a
More changes to the P25 Network data layout.
2017-10-30 13:45:59 +00:00
Jonathan Naylor
929426aa0c
Small change to the P25 network data format.
2017-10-30 12:23:49 +00:00
Jonathan Naylor
c0571edb0b
Modify the P25 UID check slightly.
2017-03-29 20:46:27 +01:00
Ryan Butler
aae96a1caf
This adds the ability to override the UID checking in P25 code to force 7 digit IDs.
...
Jonathan added this code due to a lack of CRC on P25 checking but some parties desire the ability to have any id.
It's understood that on networked connections, the need to use a 7 digit unique ID like the DMR ID is necessary.
This change is affected by adding a new parameter to the [P25 Network] section called OverrideUIDCheck and it defaults to 0.
The logic is, if the network is enabled, or if the network is disabled and the override is disabled, the check is made, otherwise it is not.
This has been field tested for all 4 configuration cases and found to work as described above.
2017-03-29 10:18:54 -05:00
Jonathan Naylor
2ac7e43929
Alter and clean up the P25 network protocol.
2016-11-01 19:01:37 +00:00
Jonathan Naylor
6fdfb93514
Simplify the P25 protocol.
2016-11-01 07:42:34 +00:00
Jonathan Naylor
9f65e2f4ef
Bring debug logging into line with the other modes.
2016-10-14 09:30:10 +01:00
Jonathan Naylor
d11ade27fc
Enable P25 RX network debugging.
2016-10-13 22:39:57 +01:00
Jonathan Naylor
dd73ccb578
Try and make the network protocol closer to that of a Quantar.
2016-09-29 18:47:36 +01:00
Jonathan Naylor
f627a18dd8
Handle network end markers and missing end of LDU frames.
2016-09-28 07:53:45 +01:00
Jonathan Naylor
b0aecf12eb
Small tweaks for the network data format.
2016-09-28 07:17:11 +01:00
Jonathan Naylor
5e22470b98
Enable the P25 network interface.
2016-09-27 20:46:41 +01:00
Jonathan Naylor
3577fbb14b
Compare the created network packets with a reference.
2016-09-22 21:26:03 +01:00
Jonathan Naylor
98ab0845f3
Clean up of processing.
2016-09-22 20:31:25 +01:00
Jonathan Naylor
21ce2abcb2
Finish off the basics of the P25 network handling.
2016-09-22 19:39:19 +01:00
Jonathan Naylor
1ff9095b09
Skeleton P25 audio transmission.
2016-09-21 07:51:13 +01:00
Jonathan Naylor
e9b330f01e
Start work on the outgoing network data.
2016-09-20 07:53:16 +01:00
Jonathan Naylor
16ec0db6d8
Add full FEC decoding to LDU1 and LDU2.
2016-09-15 20:28:56 +01:00
Jonathan Naylor
9423fb25a6
Add P25 networking, and rename DMR network files.
2016-09-14 07:41:37 +01:00